DeBary Ribbon Cutting 9 AM Sept 9, 2026
The connection along Donald E. Smith Blvd in DeBary is Complete!
See the Video here: Ribbon Cutting Video
Join the
St Johns River-to-Sea Loop Alliance
in partnership with the
City of DeBary
and Volusia County
in celebrating this important new section of the Loop
Casual Trail rides included in the Ribbon Cutting Ceremony
Free to all, but registration is required for people arriving with bicycles, and appreciated for all.
Details, timing, and other important information will be provided to those who register.
Ride Options
16 Miles Round Trip from Lake Beresford Park
19 Miles Round Trip from Thornby Park including new section
1.5 Mile walk from Sullivan Park
other options
For maps of the entire St Johns Loop see Map Navigation Tips below.






Map Navigation Tips
SUNTrail Network

To view the entire SUNTrail Network press the LINKS button and select “SUNTrail Map Link“. Once at the FDOT SUNTrail site, to view the St Johns Loop or any priority SUNTrail use the top pulldown called “Regional Trail Corridor”. There you can select St Johns Loop and if you wish add other SUNTrails like the Coast to Coast Trail.
You can also isolate by County, FDOT District, or other criteria. The colors indicate trail status: look for
Green = Existing
Gold = Programmed and Funded.
Volusia Trails

To view the Volusia County Trails press the LINKS button and select the Volusia County Trails Master Plan.
This has a LOT of information. To get started use the center icon “Layer List” and check “Existing Paved Trails” and “SUNTrail Network“. This uses the same color legend as the SUNTrail Network map: Green is existing and Gold is Programed and Funded”. You might also find the “Proposed Wildlife Conservation Corridor Connection” interesting. There is a video about the planned surface on the LINKS page.
Be In the Loop

